CONSTRUCTION

Key Projects

SERAI APARTMENTS

NORTH FREMANTLE, WA

Serai is a prestigious development encompassing the construction of 88 luxury apartments and 11 townhouses. This mixed-use development, rising eight stories high, not only offers residential units with sweeping river and ocean views but also includes ground-level commercial and retail tenancies. The development features a diverse range of residences all boasting premium high-end finishes and sustainable, future-proofed features.

Key Features

  • Construction of two buildings, with eight levels each

  • A total of 99 residential units and 3 commercial units

  • A diverse mix of one to apartments and townhouses

  • Communal areas including gardens, a makers studio, a bin store, and a watercraft store

  • Shared facilities such as a resident kitchen/dining area, whiskey lounge, communal pool, fire pit, gym, sauna, and steam room

  • Emphasis on residential amenity, environmental sustainability, location sensitivity, internal community, safety, and wider community connection

  • Cooperative and proactive engagement with adjoining owners

  • Achieve a self rated 5-star Green Star (equivalent) rating, reflecting a strong commitment to environmental sustainability and operational efficiency.

Client

Megara.

Project Value

Undisclosed.

Project Type

Mixed-Use.

Status

Contract

GMP Design and Construct.

  • Architect:  SCA.

  • Structural Engineer:  Michael Bale and Associates.

  • Façade Engineer: Inhabit.

  • Services Engineers:  D&C.

Design Team

Under construction | Scheduled Completion Q2 2026.

THE LODGE WADJEMUP

ROTTNEST ISLAND, WA

The Lodge Wadjemup project involves the comprehensive redevelopment of former Karma Lodge on Rottnest Island. This unique, low-impact development is designed to harmonise with the island’s natural setting, complement the historic built environment of the precinct, and respect the Aboriginal history of the area. Embracing the site’s significant heritage, the project aims to transform the former Karma Rottnest site into a 109-room resort.

Key features:

  • Infrastructure development and detailed civil works across the site.

  • Preservation and restoration of significant portions of existing buildings.

  • Reformatory building refurbishment encompassing 31 rooms.

  • Lakeside building refurbishment comprising 32 rooms.

  • Construction of new Poolside Accommodation with 46 rooms.

  • Construction of new facilities, including a guest pool, dining yard, bar, and kiosk accessible to all island visitors.

  • Development of a new Function Centre.

  • Comprehensive landscaping works, including hard and soft landscaping.

  • Development respecting the island’s Indigenous significance with a dedicated cultural space - the Gathering Ground.

  • Efforts to minimise negative impacts on native vegetation during construction.

Client

RLR Holdings Pty Ltd.

Project Value

$31.2M+

Construct Only.

Contract

Hotel / Mixed-Use.

Project Type

  • Architect:  Space Agency.

  • Structural Engineer:  Michael Bale and Assoc.

  • Landscape Architect:  Hassell.

  • Services Consultants:  Focus Consulting, Iconic,

    Design Australia, Link Engineering Consultants.

Design Team

Under Construction | Scheduled Completion Q2 2025.

Status

Project Manager

Encon.

186 ST GEORGES TERRACE

REFURBISHMENT PROJECT

186 ST GEORGES TERRACE, PERTH WA

West to West group have been engaged by Silver Leaf Investments to undertake the complete refurbishment of 186 SGT. 

Key features:

  • Demolition of existing façade and Level 6 roof and structural frame.

  • Full strip-out of existing building back to shell.

  • New facade works.

  • New structural steel roof framing system and recladding.

  • Installation of new complete service systems, including plant rooms for mechanical, electrical, hydraulics and fire.

  • Lift removal and replacement.

  • New bathroom and end-of-trip fitouts.

  • New lobby fitouts.

  • On floor, basebuild works.

Client

Silverleaf Investments

Value

$17M+

Project Type

Commercial

Cox Architecture

Architect

Completed Jan 2024.

Status

C2C Services P/L

Project Manager

Contract

Early Contractor Involvement, Construct Only

STANLEY COLLEGE | OUTRAM ST

67-71 OUTRAM STREET, WEST PERTH, WA

West to West Group have been recently awarded the Construct Only Contract to deliver the new education wing for Stanley College - Outram Street. This contract, in which West to West Group were originally engaged by Successful Projects, under an ECI arrangement will see the delivery of 6 new purposed build classrooms and 4 refurbished classrooms.

Key features:

  • Enabling and Site Establishment Activities.

  • Bulk earthworks and underground service installation / relocations.

  • Multi-level shell and core construction.

  • Curtain wall and façade works.

  • Internal Service installation.

  • Detailed fitout.

  • Demolition and refurbishment works.

  • Commissioning and staged handover.

Client

Stanley College | Successful Projects.

Architect

GHD Woodhead.

Project Type

Commercial | Education.

$3.6M+

Value

Stage 1 | Completed December 2022.

Stage 2 | Under Construction - Sch. Completion April 2024.

Status

Early Contractor Involvement, Design and Construct.

Contract

STANLEY COLLEGE | HAY ST

1275 HAY STREET, PERTH, WA

Leading the refurbishment of 1275 Hay Street, Perth, into a dynamic café, restaurant, and cutting-edge education facility, this project marks our third collaboration with Stanley College. Demonstrating our commitment to innovation in construction and surpassing client expectations, the transformation is set in Perth's bustling CBD. It underscores our proficiency in modernising existing structures and rejuvenating older buildings to align with contemporary requirements.

Key Features:

  • Refurbishment of existing building, including a Café, Restaurant, and Education Facility.

  • Installation of a new external lift from the basement to Level 1.

  • Facade work includes masonry, feature brickwork, copper sheeting, mesh screens, and balustrading, elevating the building's street presence.

  • Contemporary hard landscaping to create inviting outdoor spaces.

  • Operable walls on Level 1 facilitate the transformation of classrooms into multi-purpose areas, adaptable for various functions and gatherings.

  • The ground floor and Level 1 boast new wine and cocktail bars, state-of-the-art training kitchens, and a show kitchen, offering an immersive dining and learning experience.

  • Feature ceilings and high-spec joinery throughout the interior.

Client

Tassone & Singh Unit Trust Trading as Stanley College.

Contract

Early Contractor Involvement, Design and Construct.

Value

Project Type

4M+

Design Team

Status

Commercial | Education.

  • Architect: GHD Woodhead.

  • Engineer: D&C Engineers.

Under construction | Sch. Completion May 2024.

Encoré @ VAT 116

4 KENT STREET, ROCKINGHAM, WA

West to West Group have been engaged under a Construct Only contract to deliver the new entertainment venue above the existing hospitality venue VAT 116.

West to West Group shall be responsible for the completion of the following scope on behalf of VAT 116:

  • Demolition of existing façade and canopies.

  • Installation of a new external feature structural steel canopy around the building perimeter.

  • Installation of architectural feature Façade cladding and lighting.

  • Installation of new service systems including entertainment lighting and control internally.

  • Detailed internal fitout works including installation of a substantial of bespoke joinery and staging package.

  • Roof Recladding works (undertaken by our internal West to West roofing team)

As part of these works, West to West Group will be responsible for working within a live operating environment to deliver this exciting Project for our client.

Client

VAT 116.

Project Value

$2.1M+

Project Type

Hospitality.

BHO Interiors.

Design Team

Completed Jan 2024.

Status

BENNETT SPRINGS

CHILDCARE FACILITY

MARSHALL ROAD, BENNETT SPRINGS, WA

Following a successful Early Contractor Involvement (ECI) phase, West to West Group has been selected as the construction partner for the Bennett Springs Childcare Facility. Located on a site area of 2,217m2, the development is primed to feature a gross floor area (GFA) of 857m2 and a functional efficiency floor area (FECA) of 695m2.

This single-storey Childcare Centre includes front-of-house and back-of-house services and amenities to provide care and education for 96 children. The scope also includes 500m2 of parking solutions, including 24 carparks, external pavements, engaging playscapes and landscaping to the surrounds. In addition to the construction of the facility, West to West Group will also undertake the detailed fitout of all internal areas.

At West to West Group, our primary objective remains to align design and build costs with our client’s feasibility and budget, ensuring the realisation of projects while fostering positive outcomes for our clients.

Client

Jarra Property.

Architect

Peter Hobbs Architects.

Project Value

$3M+

Project Type

Education | Childcare.

Under Construction Sch. Completion Mar 2024.

Status

Contract

Early Contractor Involvement, Construct Only.

BLOOM CHILDCARE PADBURY

16 BLACKWATTLE PARADE, PADBURY, WA

As a trusted partner in childcare development, West to West Group is proud to spearhead the construction of Bloom Childcare Padbury, by Jarra Property. Our robust construction methodology is tailored to ensure durability and aesthetic appeal, focusing on resilient concrete and steel structures, stylish roofing, and thoughtful landscaping to create a transformative and engaging space for children. Covering a Gross Floor Area (GFA) of 653m2 and designed to accommodate up to 86 children, Bloom Childcare Padbury embodies our commitment to excellence and our goal to foster engaging environments for learning and growth.

Key Features:

  • Comprehensive site preparation, including demolition of existing structures and site clearing.

  • Execution of site earthworks.

  • Installation of in-ground services.

  • Pouring of concrete footings and slabs.

  • Erection of steel wall frames and trusses.

  • Installation of roof and external cladding to architectural specification.

  • Fitting off quality windows and doors to enhance natural light and accessibility.

  • Thoughtful landscaping and playscape design to provide a stimulating outdoor environment for children.

Client

Jarra Property.

Contract

Design and Construction.

Project Value

$2.7K+

Project Type

Education | Childcare.

  • Architect:  Peter Hobbs Architects.

  • Engineer:  GHC.

  • Quality Hydraulics.

  • Collaborative World Consultants.

  • Olsen Engineering.

Design Team

Under Construction Sch. Completion Aug 2024.

Status