FITOUT
Key Projects
MINTERELLISON PERTH PREMISES OFFICE
2024 Master Builders Award Finalist for Best Building Fitout $5 - $10m category
1 THE ESPLANADE, ELIZABETH QUAY, PERTH
Comprehensive fitout of MinterEllison’s new premises, located at One the Esplanade, transforming the warm shell of the base building into a sophisticated and modern workspace. One of the many highlights of this fitout includes the proposed interconnecting spiral staircase, which links the Levels 8 and 9 workplace seamlessly together.
Every detail of the fitout, from the selection and procurement of materials to the craftsmanship of the finishes, will showcase West to West Group’s unwavering pursuit of delivering excellence for our clients and subsequent end users.
By fostering open communication and close collaboration with all project stakeholders, including the client and design team, our aim is to seamlessly execute this fitout to the highest quality standards and, as always, exceed our client’s expectations.
Superintendent
Generate Property Group
Value
$8M+
Design Team
Architect: Hassell Studio
Status
Completed Feb 2024
MinterEllison
Client
Tenant Representative Office Fitout
Project Type
Services Consultant: Aston Consulting
ORACLE FITOUT BRISBANE
The fitout of the tenancy consisted of a meet and greet area, meeting rooms, collaboration area, staff hub, wellness room and general open plan working space.
Key features:
High end finishes and joinery
Audio visual system throughout meeting rooms and boardroom
Boardroom, kitchen/breakout area, workstations and collaborative hubs
Mechanical and electrical upgrades throughout
Specialised lighting and finishes breakout and wellness spaces
Feature ceilings throughout
Installation of operable walls
Project Type
Commercial Tenancy Fitout
Superintendent
Facilitate
Oracle
Client
Architect: PTID
Services Engineer: Aston Consulting
Design Team
Completed May 2024
Status
AECOM OFFICE
ALLUVION BUILDING, 58 MOUNTS BAY ROAD, LEVEL 15, PERTH
For AECOM's head office in the Alluvion Building, situated centrally in Perth's CBD, West to West Group successfully executed a high calibre tenant representative office fitout. Incorporating premium-grade finishes and modular workspace solutions, the project's design features were especially notable in the seamless transition from the base building lobby to the impressive reception area.
Key features:
High end finishes and joinery
Boardroom, kitchen/breakout area, workstations and collaborative hubs
Audio visual system throughout meeting rooms and boardroom
Mechanical and electrical upgrades throughout
Specialised lighting and finishes to main entrance/reception area
Feature ceilings to front of house
Installation of glazed operable walls
Client
AECOM Australia
Design Team
IA Design
Services Consultant
NDY Perth
Dexus
Superintendent
$3.4M+
Value
Tenant Representative Office Fitout
Project Type
Completed Mar 2023
Status
BATES SMART FITOUT BRISBANE
West to West have been engaged under an ECI Design and Construct Contract to deliver a high-end office fitout for Bates Smart, a prestigious architectural firm.
Key features:
Acoustic paneling throughout
Exposed heritage brickwork
Exposed services and soffit
Timber veneer wall finishes
High-end joinery
Acoustic ceilings
Client
Bates Smart
Project Type
Fitout
Completed May 2024
Status
ONE THE ESPLANADE: CHILDCARE FACILITY
1 THE ESPLANADE, ELIZABETH QUAY, PERTH
West to West Group has successfully delivered a multilevel, state-of-the-art childcare facility fitout within One The Esplanade. Spanning over 1000m2, this project exemplifies our expertise in managing and executing complex, large scale fitouts. With its location in a sensitive urban environment and the necessity to work within a live building, this project demanded meticulous planning, intricate coordination with the Head Contractor, and a robust collaboration with various stakeholders.
Key features:
Multilevel fitout of over 1000m2, reflecting high quality workmanship
Strategically located entry lobby seamlessly combined with office and administrative spaces
Dedicated areas for activity learning, rest, and recreation
Installation of top-tier bathroom facilities
Construction of fully-equipped kitchen facilities
Development of external landscaping, including child play areas
Execution of enabling works including waterproofing and other essential services
Comprehensive logistics management due to the project's central CBD location
Collaborative approach with building and tenant representatives, ensuring smooth operations and timely completion
Client
Brookfield Properties
Superintendent
APP
Value
$2.3M+
Project Type
Childcare Fitout
Design Team
Hassell
Stantec
Services Consultant
Completed Jun 2023
Status
STORAGE KING CAPALABA – REBRAND & REFRESH
81 Redland Bay Road, Capalaba Queensland
The Ground Floor and Level 1 of Storage King Capalaba underwent a significant refurbishment & structural Upgrade.
Key features:
Refurbishment of existing ground floor office, including demolition of existing fitout to create new reception, open retail area, staff kitchen and toilet
Demolition of Level 1 apartment and conversion to expansive storage area
Structural reinforcement of existing level 1 slab to increase load capacity for additional storage units, which included piling to the structural foundation and installation of steel columns and beams, and fitout of Level 1 with 19 new storage units
External works included upgrades to Façade to suit new warehouse rebrand, repairs to roof including roof sheet replacement and capping upgrades, and full repaint of new and existing external area
Project Type
Commercial
Abacus Storage Property Trust
Client
Completed April 2024
Status
Empire Project Management
Superintendent
THREE FLOOR OFFICE FITOUT AT 108 ST GEORGES TERRACE
Level 10, 17 and 18, 108 St Georges Terrace, Perth
West to West Group successfully delivered simultaneous fitouts across Levels 10, 17, and 18 of 108 St Georges Terrace, covering a total of 2,550m² in one of Western Australia’s A-Grade buildings. The project showcased advanced coordination and craftsmanship, integrating cost-effective, high-impact design and construction methods to create elegant, functional spaces. The fitouts were completed on time and within budget, meeting the client’s objective to attract tenants, while maintaining quality and safety throughout.
Key features:
Multi level fitouts handled simultaneously, highlighting our advanced project coordination capabilities
Significant procurement and integration of cost effective yet high impact design and construction methodologies
Stakeholder Collaboration: Harmonised engagement with the superintendent, building management
Boardrooms, carpets, and feature lighting installation
New offices and collaborative spaces
New workstations and soft wiring installation
Reconfiguration of services to ensure BCA and building compliance
Client
JLL and Realside
Value
$2.8M+
Project Type
Office Fitout
Services Consultant
NDY Perth
Status
Completed Jun 2023
Savills Australia
Superintendent
State28
Design Team
SPENCER OGDEN INTEGRATED OFFICE
THE CLOISTERS, 200 ST GEORGES TERRACE, LEVEL 8, PERTH
Whole floor fitout of Spencer Ogden’s new office at Level 8, 200 St Georges Terrace.
Key features:
Polished concrete floors applied to high traffic areas
Specialised feature lighting designed with each space destination in mind
Boardroom, kitchen/breakout area, workstations, collaborative hubs
Supply and installation of new furniture
State of the art audio visual system
New supplementary air
Specialised lighting for critical areas
The project was successfully delivered on a tight programme and budget, working closely with the consultant team and David Murdoch from Touchstone Project Management.
Client
Spencer Ogden Australia
Value
$1.3M+
Design Team
Creative Logic
Services Consultant
Alpha Zeta
Status
Completed Dec 2022
Touchstone Project Management
Superintendent
Integrated Tenant Representative Office Fitout
Project Type
QUANTUM SYSTEMS FITOUT
West to West were engaged under a Design and Construct Procurement by Quantum Systems, an international drone manufacturing company, to complete their 2 level office fitout.
Key features:
Mid-high level office fitout for Quantum Systems
Feature timber stair
Meeting rooms, conference rooms, common areas
Polished concrete floors
Exposed painted exterior soffit
New services
Design and Construct Procurement
Client
Quantum Systems
Status
Completed March 2024
Commercial
Project Type
ACKNOWLEDGE EDUCATION
647 WELLINGTON STREET, PERTH
Delivery of a comprehensive fitout for Acknowledge Education located in Perth CBD.
This 2-storey space is a quaint addition to Acknowledge Educations ever expanding campus. The new space flows into their existing neighbouring tenancy and provides additional offices and 13 classrooms, fitted with plug-and-play capabilities.
The expansion boasts new breakout areas, offices, and staff rooms allowing the new tenancy to cater for an additional 600+ enrolments.
Key features:
Integration of an adjoining vacant tenancy to extend the existing Acknowledge Education Centre
Expansion to include new classrooms through demolition and reconstruction of the brick wall between the Ground Floor and Level 1
Slab cutout and installation of new passenger lift
Service installations including new mechanical plant and equipment
Demolition of existing workstations and partitions
Supply and installation of new partitions, grid ceilings, flooring, fittings and finishes, lighting, and joinery
Acknowledge Education
Client
Generate Property Group
Superintendent
Value
$2.6M+
Tenant Representative Education Fitout
Project Type
Storyline Designs
Design Team
Nutbrook Engineering Group
Services Consultant
Completed Jul 2023
Status
PERENTI OFFICE
WILLIAM SQUARE, LEVEL 4, 45 FRANCIS STREET, NORTHBRIDGE
Delivery of a premium office space fitout which would serve as the headquarters for one of WA's largest mining services groups. The project showcases a state-of-the-art office space that is not only aesthetically pleasing but engineered to meet the high performance demands of its occupants.
Key features:
Deliver a high performing office space, ensuring seamless workflow and operational efficiency for Perenti
Premium finishes and fixtures
Installation of advanced acoustic solutions to allow for optimal sound attenuation, critical for the high-performing nature of the tenant
Client
Perenti Group
ACORPP
Superintendent
$1.5M+
Value
Tenant Representative Office Fitout
Project Type
Storyline Designs
Design Team
Nutbrook Engineering Group
Services Consultant
Completed Nov 2022
Status
ORMEAU STATE SCHOOL AMENITIES REFURBISHMENT
Ormeau State School had a comprehensive renovation of Amenities Block AB. This project included a new design that features updated amenities for all students and staff.
Key features:
Redesign of the space
The installation of new toilet partitions, and the addition of open-plan handwashing stations
The creation of a new cleaners’ store and storage area
Refurbishment of the school’s uniform shop, complete with new carpentry, electrical services, metal gates, timber screens, flooring, and painting
Project Type
Education
QLD Department of Education
Client
Completed February 2024
Status
ALLUVION AMENITIES, LOBBY UPGRADES & STAIR CUTOUT
ALLUVION BUILDING, 58 MOUNTS BAY ROAD, LEVELS 6, 7, 9, 10, & 15, PERTH
Revitalisation of multiple levels (6, 7, 9, 10 and 15) at the Alluvion Building located at 58 Mounts Bay Road.
Key features:
Incorporation of a new steel stair structure through stair penetration to enhance accessibility and flow between floors
Modernisation and enhancement of bathroom interiors with new fitouts and fixtures and upgrading floor plates
A transformative makeover of the lobby, including lighting upgrades and the installation of vaulted feature ceilings, to create an inviting and impressive entrance
Comprehensive upgrades including lighting, flooring preparation, and remedial works to uplift the aesthetic and functional quality of the spaces
Client
Dexus
Value
$5.8M+
Design Team
Woods Bagot
Services Consultant
NDY Perth
Status
Completed Oct 2022
Amenities & Lobby Upgrades
Project Type
GLENALA STATE HIGH SCHOOL REFURBISHMENT
Glenala State High School received a complete refurbishment of their toilet block, incorporating a modern design to deliver a more functional space.
Key features:
Structural Demolition
Major Services Upgrade
Feature Façade Screenin
External Civil Drainage and Concrete Works
Full Fitout of the New Amenities Block
Working Environment: Live environment. West to West Group liaised with the school throughout the project.
Project Type
Education
QLD Department of Education
Client
Completed April 2024
Status
INTERNATIONAL HOUSE- WHOLE BUILDING MAKEGOOD, NEW WASHROOM / LOBBIES AND FITOUTS
26 ST GEORGES TERRACE, PERTH
In the heart of Perth's CBD, nestled within the prestigious International House, our team undertook an extensive makegood project encompassing the entire building.
The scope of works also included the upgrade to the base building backbone and services and included 54 new bathrooms and multifloor fitout with lobby upgrades.
Key Features:
Makegood to 16 floors
Base building backbone upgrade
Lobby upgrades
54 washrooms
Multi-floor office fitout
Value
$6M+
Project Type
Multifloor make good
Design Team
Buchan Group
AWAP SGT 26 Investment Limited
Client / Superintendent
NDY Perth
Services Consultant
Completed Oct 2022
Status
IAG OFFICE FITOUT
Fitout of the IAG’s Office, including a full communications room, upgrade while creating and managing a segregated live environment for their call centre with no disruption to operations.
Key features:
Full demolition of existing space for new fitout
Segregated live environment set-up with acoustic and visual separations while maintaining secure access control and amenities for staff
Installation of all new services
New Communications room fitout coordinated with no downtime to operations
Supply and installation of floor finishes to high specification
AV coordination to new boardrooms and meeting rooms
Supply and installation of new workstation furniture and breakout space joinery
Upgrade to fire, mechanical, security and electrical services
Superintendent
Acuity PM
Project Type
Commercial
Status
Completed Jun 2023
IAG (Insurance Australia Group)
Client
END OF TRIP FACILITY
251 ST GEORGES TERRACE, PERTH
Transformation of the End of Trip (EOT) facility.
Key features:
Modifications to the EOT substructure, enhancing its foundational integrity
Integration of new hydraulic tank infrastructure, ensuring optimal functionality
Development of a modern basement lobby and a dedicated entry point
West to West played a pivotal role not only in the execution but also in the initial stages, successfully value engineering several components of the design and engineering. This proactive approach ensured that the client received a design that was both cost effective and optimally serviceable, striking a balance between aesthetic appeal and functional efficacy.
Client
Centuria
Project Type
Basement EOT
Design Team
Maine Architecture
Services Consultant
NLCI Engineering
Status
Completed June 2021
$1M+
Value
MARKET ORGANICS FITOUT
Fitout of the new Market Organics store, strategically located on the ground floor of a residential tenancy block in a bustling new suburban development.
Key features:
New internal partitions with architecturally designed ceilings throughout
Installation services and specialised cold and freezer rooms
Supply and installation of specialised catering services
Supply and installation of floor finishes to high specification
Upgrade to fire, mechanical and electrical services to meet the new fitout demands
Client
Market Organics
Project Type
Fitout
Completed Aug 2023
Status